Work Summary 2013 all
SNF
5 back Packing Trips,
2 Base Camp Trips
9478 volunteer Hours
CR&H 1 Back Packing 9 972
CR&H 2 Back Packing 16 1616
CR&H 3 Back Packing 15 1616
Ansel Adams Back Packing 13 928 SB 1023
Silver Pass Back Packing 11 913
Edison Base Camp 29 1894
Courtright Base Camp 29 1444 31 miles
122 9,478
SQNF
Manter Back Packing 7 732 17 miles
Big Meadow Base 46 3224
Kennedy Meadows Back Packing 32 1374
Tule River Base 23 1046
Manter Meadow #2 Back Packing 15 1000
123 7376
Other Totals
Hensley Day 15 450 4
Eastman Day 8 32 3
Foothill Conservancy Day 50 200 2
Foothill Conservancy Day 50 200 2
Tree Fresno Day 8 32 4
131 914 15 miles
Grand Totals 376 17,768 63 miles
17,768 volunteer hours X $22.50 = $339,780
SNF Totals
CUT TREES
130 – 0”-6”
55 – 6”-12”
118 – 12”-24”
15 – 24”-36”
= 318 TREES TOTAL
BRUSHING
HEAVY 15MILES
TREAD IMPROVEMENT
1080FT HEAVY
15 MILES LIGHT
600FT TRAIL REROUTES RESTORED
NEW STRUCTURES
30FT CAUSEWAY
65 DRAINS / DIPS
68 ROCK WATER BARS
27 WOOD WATER BARS
100’ RETAINING WALLS
89 ROCK STEPS
8 RIP WRAP ROCK STEPS
1 ROCK CULVERT
9 CHECK DAMS
20FT WATER DIVERSION/REROUTE
32 FOOT JUNK WALL
REPAIRED STRUCTURES
2 REESTABLISHED CREEK CROSSING
104 WATER BARS REPAIRED
313 WATER BARS CLEAN
8 DRAINS/DIPS REPAIRED
43 DRAINS/DIPS CLEANED
2 ROTTED RAILS
40 ROTTED LOG STRINGERS
NEW TRAIL
1 MILE (COURTRIGHT)